Marriot Road / Rosamel Road Reconstruction

Project Length: 2.5 Weeks
Contractor: J.A.K Civil / Shire of Harvey
Project Value: $35,000
Project Date: February 2016

Project Outcome:

Successful completion of the road construction without any major or minor incidents.
This project involved delivering full traffic management services including production of the Traffic Management Plan, supply of all traffic control devices, personnel, and vehicles, and implementation for the duration of the works.
CB Traffic Solutions provided 4 traffic controllers, 2 vehicles, 2 Variable Message Sign trailers, and a variety of traffic control signs and devices in order to maintain a safe worksite. As part of a heavy haulage route, it was vital that liaison was carried out with MRWA Heavy Vehicles division and that the existing roadway remained open to heavy vehicles at all times.
A side access track was installed and used in order to ensure that heavy vehicles continued to have access past the site.
The result of this project was very positive, with no major or minor incidents occurring at any time during the construction.
The project was able to be completed in a timely manner, and to the strict budget provided.

Project References:

Kevin Anderson – Project Manager – J.A.K Civil Mobile – 0439 931 657
Peter Kay – Manager Works and Services – Shire of Harvey 08 9729 0362